Skip to content

How does usage work?

Every job you submit draws on your monthly allowance, which resets on your billing date. Jobs are not all the same size: a Revit job does more work than an AutoCAD one and draws more, and a request that turns into a very large set of operations draws more again. A request you send to several drawings at once is one job per drawing, and each draws on your allowance like a separate request. Your project page always shows where you stand before you submit, and the small ring next to your plan name at the bottom of the sidebar fills as you use this month's allowance. Hover it to see the percentage used, or open Settings for the same percentage as a bar. If a job fails, the usage is returned to your account automatically, and a job that finishes without changing anything is not counted either. Usage is metered by the processing a job needs, so what a job draws depends on the size and complexity of your file, how many operations the request turns into, and the compute it takes to run them. What a job draws today is set by your file and your request. Usage rates are dynamic, though, and may change with demand: at times of high load, when many requests are running across the platform at once, a job may draw more usage than the same job would at a quieter time. We may adjust usage rates, allowances and how usage is metered as demand and processing costs change, as our Terms allow.

More in Plans and Billing

Did this answer your question? If not, contact support and send us the drawing.